Thermal insulation coating 4
Price:¥0.00
Interior wall paint is used for general decoration latex paint. Emulsion paint is emulsion coating, according to the different substrate, divided into two kinds of polyvinyl acetate emulsion and acrylic emulsion. Latex paint with water as a diluent, is a convenient construction, safety, water washable, breathable paint, it can be based on different color schemes to deploy different colors. Categories: water interior wall paint, oil interior wall paint, dry powder type interior wall paint, is a water-based paint, mainly by water, emulsion, pigments, fillers, additives composition of five components.
Using the method of
First, before painting the substrate to confirm the coating requirements;
Second, coating at 5~35 DEG C, the air humidity requirements of coating should be less than 85%;
Third, choose the appropriate construction method and construction tools, construction work according to the construction process recommended by
;
Fourth, control coating interval, after reaching the re coating time, you can do the next brushing. Too much heavy coating time will result in slow drying at the bottom and wrinkling and other problems.
Fifth, please do not mix with organic solvent, acid base, oil and other chemicals.
Sixth. Air circulation shall be maintained during construction and the paint shall be kept away from direct sunlight and heat sources.
Seventh, in order to avoid contamination of the skin and eyes or inhalation of excessive paint fog, please use masks, gloves and other protective equipment.
Eighth. If infected with eyes, rinse immediately with plenty of water and ask a doctor for treatment.
Ninth. Place it where children can't get it.
The construction technology of
Materials for
Paint, filler, high stool, scaffolding, putty plate, roller, brush, brush, paint barrels, sandpaper, rubber scraper, putty groove, cloth, silk, cotton and other half.
The operating conditions of
1, the surface should be basically dry, the moisture content of the base shall not be greater than 10%.
2, plaster work has been completed, the wall pipe, hole, yin and yang angle advance processed.
3, doors and windows should be installed in advance.
4, a large area should be done before the model, after the acceptance of qualified, can be a large area construction.